1 Project Information: Enter basic project details including project name, client name, location, and select your preferred unit system and electrical standards.
2 Distribution Systems: Input quantities and costs for main distribution boards (MDBs), sub-main boards (SMDBs), distribution panels, and circuit breakers.
3 Cables & Wiring: Specify lengths and costs for power cables, cable trays, conduits, bus ducts, outlets, and switches. Unit system switch automatically converts values.
4 Additional Costs: Configure direct costs (equipment, tools, permits) and indirect costs (contingency, profit margin, VAT).
5 Calculate: Click "Calculate" to generate your cost breakdown and labor requirements.
6 Export: Use the export buttons to save your estimate as PDF or Excel for professional submissions.
Total Material Cost = ∑(Quantity × Unit Cost)
Total Labor Cost = ∑(Quantity × Labor Hours × Labor Rate)
Total Direct Cost = Materials + Labor + Equipment + Tools + Permits
Overhead Cost = Total Direct Cost × Overhead Rate
Contingency Cost = Total Direct Cost × Contingency Rate
Total Indirect Cost = Overhead + Contingency
Cost Before Profit = Direct Costs + Indirect Costs
Profit = Cost Before Profit × Profit Margin Rate
Total Before Tax = Cost Before Profit + Profit
VAT Tax = Total Before Tax × VAT Rate
Final Price = Total Before Tax + VAT Tax
Enter your project details and click "Calculate" to see results.
Client:
Location:
Prepared By:
Date:
Standard:
| Item No. | Scope of Work | Quantity | Unit | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|
| Item No. | Scope of Work | Quantity | Unit | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|
| Item No. | Scope of Work | Quantity | Unit | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|
| Category | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|