Project Inputs
How to Use This Calculator
1 Project Information: Enter project details like name, client, location, and date.
2 Unit System: Choose between Imperial (feet) or Metric (meters) units.
3 General Parameters: Set labor rate, overhead, profit margin, and currency.
4 Pipes & Fittings: Select conduit type and add items for each category with specific sizes.
5 Calculate: Click "Calculate" to generate the cost breakdown and labor requirements.
6 Export: Export results as PDF or Excel for professional use.
Calculation Formulas
Direct Costs:
Material Cost = Quantity × Unit Cost
Labor Cost = Labor Hours × Labor Rate
Total Direct Cost = Sum of Material and Labor Costs
Indirect Costs:
Overhead Cost = Total Direct Cost × Overhead Rate
Profit:
Profit = (Direct Cost + Overhead) × Profit Margin Rate
Final Cost = Direct Cost + Overhead + Profit
Standard Sizes
PVC Conduit Sizes:
- Pipes: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 75 mm, 90 mm, 100 mm, 110 mm, 150 mm, 200 mm
- Couplings: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 75 mm, 90 mm, 100 mm, 110 mm, 150 mm
- Elbows: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 75 mm, 90 mm, 100 mm, 110 mm, 150 mm
- Connectors: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 75 mm, 90 mm, 100 mm, 110 mm, 150 mm
- Locknuts & Bushings: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 75 mm, 90 mm, 100 mm, 110 mm, 150 mm
EMT Conduit Sizes:
- Pipes: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 78 mm, 103 mm
- Couplings: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 78 mm, 103 mm
- Elbows: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 78 mm, 103 mm
- Connectors: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 78 mm, 103 mm
- Locknuts & Bushings: 16 mm, 20 mm, 25 mm, 32 mm, 40 mm, 50 mm, 63 mm, 78 mm, 103 mm
Estimate Results
Enter your project details and click "Calculate" to see results.
Project:
Client:
Location:
Prepared By:
Date:
Bill of Quantity
| Item No. | Scope of Work | Quantity | Unit | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|
Indirect Costs & Markup
| Item No. | Scope of Work | Quantity | Unit | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|
Summary
| Category | Material Cost | Labor Hours | Labor Cost | Total Cost |
|---|